Energy site sourcing · Bitcoin mining

Power in.
Bitcoin out.

Find energy for your mining operation. We research sites around your power needs and budget, with the infrastructure, capital gaps and contacts to plan your next move.

Proton Mining is a bitcoin mining company that sources energy and hardware for miners who own their machines; we do not sell cloud-mining contracts.

Explore
Proton Energy Sites

Find the site.
See what it takes.

From landfill gas to hydro, wind and already-powered sites. Explore the energy, what is built and what you still need.

8Energy routes
U.S.Site research
1Your brief

A world of energy.

Explore an energy source.

About this globe

Illustrative energy regions, not available site listings. Map data: Natural Earth. Terrain: Solar System Scope (CC BY 4.0).

Inside a mine

Explore a possible setup.

An illustrative gas-to-mining layout: treatment, generation, electrical equipment and containers of machines. A real project needs site-specific design, approvals and a funded build scope.

Drag to rotate · hover a part to identify it · scroll to zoomDrag to turn · pinch to zoomScroll from outside this box

  1. Gas conditioningScrubbing and knockout before the engines
  2. GenerationEngines burning gas that would otherwise be flared
  3. TransformerStepped down and distributed to the container
  4. CoolingA closed water loop; the roof cooler rejects the heat
  5. Retrofitted containerA 40 ft shell rebuilt for power, cooling and racking
  6. ASIC arrayRacked miners, monitored per unit
  7. Power distributionBreakers and metering, per rack
  8. UplinkNetwork link; curtailment signals land here
Why stranded energy?Landfill gas, flared gas and unused power.
The model

Stranded energy on one side.
Hashrate on the other.

Some gas and power sites have limited routes to market. A local mining load may be worth investigating, but the delivered cost, operating hours, permits and existing energy commitments determine whether a project can work.

Our starting point is a researched shortlist: the energy source, evidence of usable infrastructure, remaining work and people who can confirm access.

Look beyond the rate

Fuel price is only one input. Delivery, generation, maintenance and the hours you can actually operate change what a kilowatt-hour costs.

Start with what exists

Collection systems, engines and electrical equipment can reduce a build scope only when their condition, capacity and right to use are confirmed.

Plan for interruptions

A flexible operating schedule may help a project fit the site. Curtailment limits, restart procedures and lost production need to be included in the plan.

Work with us

Choose your next step.

Ask us to research a potential site for your operation, discuss your hosting requirements, or explore a partnership around your energy.

For miners

Hosting

Explore the equipment and proposed hosting setup, then request current availability and a site-specific offer. A rendering or indicative estimate is not a capacity reservation.

Hosting details
  • Confirm the site, available capacity and cooling compatibility
  • Request energy, hosting and one-time costs separately
  • Agree minimums, duration and curtailment terms in writing
  • Define maintenance, reporting and payout responsibilities
Explore hosting
For energy & site owners

Explore a use for your power

Have gas or power that may suit a mining project? Share the resource, infrastructure and rights you control. You fund and own the build, and Proton pays per kWh for the power its placed miners use.

Energy partnership details
  • Map existing assets and the work still to fund
  • Explore the owner-funded model: Proton pays per kWh for the power used by the miners it places there
  • Establish permits, supply rights and a realistic schedule
  • Confirm the build you fund and who operates each part
  • Assess emissions against the actual site baseline
See how a deal works
From research to a projectScreen, verify, agree and plan.
How we operate

Research first. Commit with evidence.

Site sourcing delivers research. Development and operating services require their own scope and agreement.

Source

Screen public facility, energy and permit records against your brief. Record dated evidence, uncertainties and relevant contacts. A promising record identifies a question to investigate; it does not establish available power.

Verify

The owner or rights holder must confirm interest, net supply and existing commitments. Technical diligence then checks equipment condition, gas or electrical measurements, access and permitting requirements.

Price the gaps

Separate reusable infrastructure from new work, and quoted costs from allowances or unknowns. Compare capital, delivered energy and operating costs across different production scenarios.

Agree the next stage

Before proceeding, put funding, construction responsibilities, supply terms, approvals and operating arrangements in writing. The research service does not reserve a site or guarantee that a mine can be built.

For energy & site owners

Managed Energy Hosting.

Fund and own the infrastructure while Proton coordinates development and manages customer hosting. Explore a phased plan built around your existing assets.

Why Proton?Energy access, infrastructure and capital in one view.
Why Proton

See the site.
Understand the gaps.

Our sourcing service brings the energy picture, documented infrastructure, remaining capital scope and the organizations and public contact routes to approach, in one research workspace. Use it to decide which conversations and diligence steps deserve your time.

  • Energy-first site sourcing. We built our own screening stack over flare, landfill, facility, and permit data. Site selection is a data problem before it is a real-estate problem.
  • Capital before commitment. Separate documented equipment, potential reuse and the work still to fund. An unpriced item remains an open cost.
  • Evidence you can check. Dated sources and visible gaps help distinguish what is documented from what needs owner or technical confirmation.
  • Access is a separate question. A site can have equipment and still have no power to offer. Identify who controls the energy, land and commercial decision.
  • Site-specific economics. Test usable hours, delivered cost and capital requirements. Environmental benefits also need a measured baseline and project-specific assessment.

Tell us what you are planning.

Whether you need miners and hosting, a potential energy site for your own operation, or to explore selling surplus gas or power to a mining load, on terms set in writing, start with your requirements.